Factory of SEL Tiger TMT in Sambalpur

Sambalpur

TMT Bar Manufacturing Factories - Sambalpur


The Sambalpur manufacturing plant is located in the state of Odisha and consists of an integrated steel plant with an installed metal capacity of 2.90 MTPA (including intermediate and final products), as of December 31, 2020.

As of December 31, 2020, the manufacturing plant comprises of two pellet plant, seven direct reduced iron kilns for sponge iron (two kilns of 350 TPD each, two kilns of 100 TPD and three kilns of 500 TPD each), 12 billet furnaces (four furnaces of 18 TPH each, four furnaces of 8 TPH each and four furnaces of 12 TPH each), one rolling, structural, wire rod and pipe mill each and seven ferro alloy furnaces (two furnaces of 6.0 MVA each, two furnaces of 9 MVA each and three furnaces of 11 MVA each).

SEL Tiger TMT Bar manufacturing plant

Table with capacities


The following table highlights the installed capacities as of December 31, 2020 and proposed capacity expansions at our Sambalpur manufacturing plant:

Particulars Existing Installed Capacities as of December 31, 2020* Proposed Capacity Expansion*
Pellet 1,200,00 TPA 600,000 TPA
Sponge iron(1) 792,000 TPA 561,000 TPA
Billet(2) 401,280 TPA 461,200 TPA
Rolling mill and wire rod mill 320,000 TPA 510,000 TPA
Structure mill 60,000 TPA
Pipe mill 30,000 TPA
Ferro alloy(3) 98,000 TPA 14,000 TPA
*As certified by Kalyan Bhattacharya, Chartered Engineer, by certificate dated February 15, 2021.

Note
    • The information relating to the existing installed capacity of our manufacturing plant as of December 31, 2020 and proposed capacity expansion of our manufacturing plant are based on various assumptions and estimates that have been taken into account for calculation of the installed capacity. These assumptions and estimates include the standard capacity calculation practice of the steel industry after examining the calculations and explanations provided by our Company and the capacities and other ancillary equipment installed at the manufacturing plant.

 

    • The assumptions and estimates taken specifically into account include the following:
      (1) sponge iron (direct reduced iron): capacity of each kiln in TPD X 330 days per year;
      (2) billet: capacity of each furnace in TPH X (24 hours per day/ heat cycle) X 330 days per year; 1 heat cycle = 3 hours;
      (3) ferro alloy products: furnace with 1 MVA capacity is equivalent to 1,555.56 TPA. The installed capacity of ferro alloy products may vary depending on the type of ferro alloy produced.