Factory in Jamuria - Banner of SEL Tiger TMT

Jamuria

TMT Bar Manufacturing Factories - Jamuria


Currently, we have integrated powerful steel plant operating in India at Jamuria. As of December 31, 2020, the aggregate installed metal capacity of our manufacturing plants was 5.71 million tonne per annum (“MTPA”) (comprising intermediate and final products).

Our manufacturing plants also include captive power plants with an aggregate installed capacity of 227 MW, as of December 31, 2020. We are also in the process of increasing the capacities of our existing manufacturing plants and captive power plants, which is expected to increase our aggregate installed metal capacity (comprising of intermediate and final products) from 5.71 MTPA, as of December 31, 2020, to 11.60 MTPA and captive power plants aggregate installed capacity from 227 MW, as of December 31, 2020, to 357 MW.

These proposed expansions are expected to become operational between Fiscal 2022 and Fiscal 2025. In addition, We also have our factories at Mangalpur, Pakuria (installed capacity of 0.04 MTPA) & Giridh in West Bengal.

SEL Tiger TMT Bar manufacturing plant

Table with capacities


The following table highlights the installed capacities as of December 31, 2020 and the proposed capacity expansions at our Jamuria manufacturing plant:

Particulars Existing Installed Capacities as of December 31, 2020* Proposed Capacity Expansion*
Pellet 1,200,000 TPA 600,000 TPA
Sponge iron(1) 537,900 TPA 947,100 TPA
Billet(2) 491,040 TPA 653,440 TPA
Rolling mill and wire rod mill 350,000 TPA 744,000 TPA
Structure mill 60,000 TPA
Ferro alloy(3) 70,000 TPA
Blast furnace 600,000 TPA
Ductile pipe 200,000 TPA
*As certified by Kalyan Bhattacharya, Chartered Engineer, by certificate dated February 15, 2021.

Note
  • The information relating to the existing installed capacity of our manufacturing plant as of December 31, 2020 and proposed capacity expansion of our manufacturing plant are based on various assumptions and estimates that have been taken into account for calculation of the installed capacity. These assumptions and estimates include the standard capacity calculation practice of the steel industry after examining the calculations and explanations provided by our Company and the capacities and other ancillary equipment installed at the manufacturing plant.
  • The assumptions and estimates taken specifically into account include the following:(1) sponge iron (direct reduced iron): capacity of each kiln in TPD X 330 days per year;
    (2) billet: capacity of each furnace in TPH X (24 hours per day/ heat cycle) X 330 days per year; 1 heat cycle = 3 hours;
    (3) ferro alloy products: furnace with 1 MVA capacity is equivalent to 1,555.56 TPA. The installed capacity of ferro alloy products may vary depending on the type of ferro alloy produced.

Our Certificates


CTO CERTIFICATES

Want To Use SEL TIGER TMT?